BCA report for townhouses, up to three on a site
Attached townhouses are Class 1a while each dwelling sits on the ground with its own entry. Each separating wall, each dwelling's fire separation to the boundaries and the common driveway, and every dwelling on its own get assessed.
Send your drawings → Get an instant quote
A certifier replies within one business day with what the job needs and a fixed fee, GST shown.
What the report looks at
- Every separating wall and its junction with the roof and the external walls
- Fire separation to boundaries and to any garage or carport
- Stairs, barriers and wet areas in every dwelling
- Energy efficiency, and livable housing where the state applies it
What you get
A full deemed-to-satisfy assessment against the current NCC with every non-compliance identified, the drawing reference, and a practical way to fix it, written so it can go straight to the consent authority or the certifier. Signed by an A1 registered certifier. In your inbox in 72 hours from a complete drawing set, one revision included.
Fee
- $3,300 inc GST ($3,000 + GST) for the BCA report, one revision included
- Access report with it: $1,650 inc GST ($1,500 + GST)
- 24-hour delivery at +50%
Get an instant quote now
Answer a few questions and the fee is on the screen, GST shown, before you give us your name. Accept it and send the drawings.
Something larger, or Class 2, 3, 4 or 9c? Send it through and a certifier replies with a fixed price inside a business day.
Questions
What about four or more townhouses?
Priced by a certifier within a business day. Send the drawings through the same form; the quote comes back fixed.
What drawings do you need?
Site plan, floor plans, elevations and sections as PDF. For alterations, as-built drawings of the existing building as well.
Do you inspect the site?
No. The report is prepared from the drawings, which is what makes the fee fixed and the delivery 72 hours.