Complying development skips the DA: the certifier issues a complying development certificate when the design meets the Codes SEPP and the NCC in one step. The NCC part is where CDCs stall, because the certifier cannot issue until every provision is satisfied on the drawings. A BCA report lodged with the CDC application answers those questions first.
Send your drawings → Get an instant quote
A certifier replies within one business day with what the job needs and a fixed fee, GST shown.
What the report looks at
- Fire separation to the boundaries, the usual sticking point on narrow lots
- Structure, wet areas, stairs, barriers, light and ventilation
- BASIX commitments shown on the drawings
- Secondary dwellings and dual occupancies under the Housing Code
What you get
A full deemed-to-satisfy assessment against the current NCC with every non-compliance identified, the drawing reference, and a practical way to fix it, written so it can go straight to the consent authority or the certifier. Signed by an A1 registered certifier. In your inbox in 72 hours from a complete drawing set, one revision included.
Fee
- $3,300 inc GST ($3,000 + GST) for the BCA report, one revision included
- Access report with it: $1,650 inc GST ($1,500 + GST)
- 24-hour delivery at +50%
Get an instant quote now
Answer a few questions and the fee is on the screen, GST shown, before you give us your name. Accept it and send the drawings.
Something larger, or Class 2, 3, 4 or 9c? Send it through and a certifier replies with a fixed price inside a business day.
Questions
Does a CDC need a BCA report?
The certifier assesses the NCC before issuing the certificate. A report from the drawings resolves the questions before they become requests for information, which is where CDC timeframes are lost.
What drawings do you need?
Site plan, floor plans, elevations and sections as PDF. For alterations, as-built drawings of the existing building as well.
Do you inspect the site?
No. The report is prepared from the drawings, which is what makes the fee fixed and the delivery 72 hours.