Tasmania

BCA reports for Hobart and Tasmania

A deemed-to-satisfy assessment of the drawings against the NCC, written for the building surveyor who decides the approval in Tasmania. Price on the screen now, report in 72 hours, one revision included.

Send your drawings → Get an instant quote

A certifier replies within one business day with what the job needs and a fixed fee, GST shown.

Rather talk it through? Call 02 9128 2002 or leave your number and we call you back.

How approval works in Tasmania

Planning comes first: a planning permit under the Land Use Planning and Approvals Act 1993 where the planning scheme requires one. Building approval is separate: a certificate of likely compliance from a building surveyor, then the building permit from the council permit authority, under the Building Act 2016.

The building surveyor decides whether the drawings meet the NCC. A BCA report answers those questions before the application is lodged, with every non-compliance identified, the drawing reference and a practical fix, so the approval is not a round of requests for information.

What we assess in Hobart and across TAS

  • Houses, dual occupancies and up to three townhouses (Class 1a), including secondary dwellings
  • Sheds, garages and carports (Class 10a)
  • Shops, offices, cafés, warehouses, factories and childcare centres under 2,000 m² (Class 5 to 9b)
  • Apartments (Class 2), boarding houses and hotels (Class 3) and aged care (Class 9c), quoted by a certifier
  • Access reports to NCC Part D4 and AS 1428.1
  • Performance solutions for light and ventilation, stairs, handrails, tactile indicators and weep holes

Livable housing in Tasmania

Tasmania adopted the NCC livable housing provisions, so new Class 1a houses and Class 2 sole-occupancy units must meet the ABCB Livable Housing Design Standard, subject to any variation in the state's NCC appendix. The building surveyor checks it as part of a certificate of likely compliance from a building surveyor.

The assessment goes element by element so the approval is not a request for information.

Fees

  • BCA report, Class 1a: $3,300 inc GST ($3,000 + GST); Class 10a: $3,300 inc GST ($3,000 + GST)
  • BCA report, Class 5 to 9b under 300 m²: $3,300 inc GST ($3,000 + GST); 300 to 2,000 m²: $5,500 inc GST ($5,000 + GST)
  • Access report $3,300 inc GST ($3,000 + GST), or $1,650 inc GST ($1,500 + GST) with a BCA report
  • 72-hour delivery from a complete drawing set; 24 hours at +50%

Questions

Who approves the building work in Tasmania?

The building surveyor. The report is advice to you and to them: it does not replace the approval, it makes the approval quicker by settling the NCC questions first.

Do you inspect the site?

No. The report is prepared from the drawings, which is what makes the fee fixed and the delivery 72 hours.